    Energy-Related Projects

HOME PROJECT >Energy-Related



Year

Project Details

Clients

1999

Construction for facilities and pipelines at Incheon International Airport Construction Proejct. Woo Sung Industry Machinery

2000

Constrution for the outdoor pipeline of a heating and cooling system at the Korea Military Academy. DI Coporation

2000

Insulation work for the welds and valves of facility utility-pipelines at Incheon International Airport. Lip Sung

2000

Construction for the cold insulation of the energy supplying plant at LP C2, TIE-IN. Yeocheon NCC

2001

Construction for laying pipelines underground and for facilities of a landfill LFG recycling project in Ulsan Metropolitan City. Ul-San Metropolitan City

2001

Installation work for a heat transport system of reconstructing Wang-Ja apartment complex. Sindaeyang Plant

2001

Insulation work for utility pipelines at Youngjoung-do International Airport. Incheon International Airport Public Coporation

2002

Insulation work for heat fruid transport pipelines in Incheon New Airport Town. Incheon Airport Energy

2002

Construction work for inserting the pipelines in Incheon New Airport Town. Kumho Industry

2002

Insulation work for the water supplying pipelines at KwangWha 2nd bridge. Haisung

2002

Construciton work for the mechine pipelines of utility-pipe conduit at Incheon international airport. Lip Sung

2003

Installation work for heat supplying pipeline network. Kwangjin Chemistry

2003

Restoration work for the distribution pipeline between KuMi Power Plant and Seong And Synthetics. Sandan Energy

2003

Construction work for the district heating system under extending Seould Gangseo Post Office Building. Woolung Construction

2003

Work for the alteration and relocation of the district heating system under extending Seould Gangseo Post Office building. Sinjin ENC

2003

Construction work for district heating system under the modification of a post office building in Seoul Woolung Construction

2004

Construction work for the ground and buried pipelines of the heat pipeline network in Onsan industrial complex. LS -Nikko Copper

2004

Construction work for the outdoor utilities of hot water and LNG pipelines. Club Polaris

2004

Work for machineries, pipeline arrangement, civil construction and insulation under the construction of a steam supply & demand system and a boiler automation system. Hankook Paper

2004

Relocation work for the steam pipelines in the district 4 of Kumi Industrical Complex. Hankook Industry Gas

2004

Work for installing the steam supplying pipeline at Samooh Pharmaceutical Co. Samo Medicine

2005

Construction work for the steam gauges V/V station of YARD STX Space Korea

2005

Work for dismantling the heat supplying plant at Florida Polyamad Co. Gorea Zinc

2005

Relocation work for the steam pipeline of the business center in Kumi power plant, and Dismantlement work for the steam pipeline at HwaSung Intech Co. STX Energy / Gumi Power Plant

2006

Construction work for the heat pipleline as CES Business Project in Yangjo town. Kyungki CES

2006

Insulation work under the 2nd step construction for the suppy pipeline at a petroleum chemical port. Ilyang Construction

2006

Incineration Heat Supplying Project in Sungsu industrial complex in Daegu. Yu Il Development

2006

Construction work for replacing the condensate water pipeline in 2-A district of Kumi Power Plant. STX Energy

2006

Construction for installing heat supplying pipelines at Solbay Chemical Co. Korea Zinc

2006

Construction for replacing an underground steam pipeline network. Daekwang Precision Industry

2006

Work for complementing main pipe rack supports Korea Zinc

2007

Construction work on zone 3 for heat supplying pipelines under the construction of integrated energy plant on Asan Baebang district.  LH

2007

Construction work on Cheongla district 1 & 2 for the heat supplying pipelines under the construction of Incheon City integrated energy plant. Cheong La Energy

2007

Work for installing Jaesan Energy 1MW solar power plant Simpo Energy

2007

Work for installing Chanhwan Development 1MW solar power plant. Simpo Energy

2007

Pipeline work and civil engineering work under the 2nc steap steam streamlining project of Dongbu Hitech Co. Samsung Everland Coporation

2007

Construction work for installing the auto pneumatic trash collection system in Sungnam & Pangyo cities, and for outdoor energy supplying pipelines and civil engineering work (1st waste collection area). Daewoo Construction Public Coporation

2007

Construction work for the heat supplying pipelines and appurtenant system under the construction of CES project in Yangju traditional village Kyungki CES

2007

Construction work for the pipelines of machine equipment and a heat supplying project. Kangwon Land

2007

Civil-engineering work under the construction of Changhawn solar power plant. Changhwan Development Co.,Ltd.

2007

Fabrication work for facilities and equipment under the construction of Gilsan solar power plant. Energy Solution

2007

Fabrication work for facilities and equipment under the construction of Sinheung solar power plant. Energy Solution

2007

Fabrication work for facilities and equipment under the construction of Hanlim solar power plant. Energy Solution

2007

Construction work for inserting steam suppying pipelines, and civil-engineering work. JEC Chemical

2007

Installation work for a auxiliary boiler, TO 55K PROCESS LINE MOV+B64 and others. STX Energy Co.,Ltd.

2008

Construction work for connecting the heat supplying pipelines between Hangang New City and Gulpo under the construction of Kimpo integrated energy supplying plant. Cheong La Energy Co.,Ltd.

2008

Construction work for the heat supplying pipelines of Incheon power plant under the construction of Cheongla cogeneration power plant. Cheong La Energy Co.,Ltd.

2008

Construction work for the solar power generation facility of Pusan complex power plant Korea Southern Power Co.,Ltd.

2008

Civil-engineering work and work for main pipelines under the construction of steam pipelines on Kang-Il district 2 and Go-Duk district. Korea Metropolis Gas

2008

Work including civil-engineering work for buring condensate water & propylene pipelines under extra construction of SKC steam supplying pipelines. SKC

2008

Work for the heat supplying pipelin network under the construction on Sin-Hyun district 2 of Cheong-La cogeneration plant. Cheong La Energy

2008

Construction work for a pneumatic trash transport facility and for building Sungnam Pangyo TK4 apartment complex. Korea National Housing Coporation

2008

Work for fabricating equipment and facilities under the construction of Yeon-Gi solar power plant. EN Soft

2008

Work for installing the trash chutes of Pan-Gyo Bungi Guksa as well as purchasing. Entob

2008

Construction work for trash transport pipelines under the construction of building Pan-Gyo middle school and four other schools on a private fund project. Brown Construction

2008

Work for installing a trash transport system (A1-A B/L) under the system construction. MOA Construction

2009

Civil-engineering work for Kimpo electric supplying plant. KEPCO

2009

Civil-engineering work for moving a mobile boiler on Yang-Gok & Ma-Gok district under Kimpo integrated energy project. Cheong La Energy

2009

Construction work for heat supplying pipelines at Gawang-Ju Insurance Center. Kwangju CES

2009

Civil-engineering work for riverbank road 154kv under the construction on Kang-dong CES riverbank section. Hana Electric

2009

Expansion construction for a water heating facility at Dong-Yang Environment. Daejeon Cogeneration Plant

2009

Civil-engineering work for removing a mobile boiler on Yang-Gok Masong district under Kim-Po integrated energy project. Cheong La Energy

2010

Construction work for facilities, W912UM-05-D-0015, T, 0#0005 in Dae-Gu USA Far East Military Engineer

2010

Construction for creating green space and dismantling the dilapidated buildings of Samsung Electronics. Samsung Electronics

2010

Construction for steam supply & demand pipelines and subsidiary work at Korea Zinc Co. Hankook Paper

2010

Work for machine equipment under the construcion of USD G Humphreys, Korea. FED

2010

Construction wrok for relocating Yeo-Su steam supplying pipeline. SPT Co.,Ltd.

2010

Work for machine equipment under HTACC-KCOIC in Osan. Defense Installation Agency

2011

Construction work for condensate water recovery pipelines at KOC Korea Zinc

2011

Civil-engineering work for the heat source facilities (Unit 5 & 6) for cogeneration conversion facility under Cheong-La cogeneration project. Cheong La Energy

2011

Installation work for a solar water heating system at a nursing home senior center in Cheong-yang. Cheong Yang Gun

2011

Construction work for the water tank of W91QVN-11-C-0230 Repair water storage tanks FED

2011

Installation work for the disposal facility of  a waste water treatment plant in Jang-An agricultural industrial complex. Cheong Yang Gun

2011

Construction for relocating heat transport pipelines. Moo Lim Power

2011

Cleaning work for the boiler in the hospital in Osan military airport base under Osan AFB Burners(Mechanical Works) FED

2011

Manitenance for the shut-off valves of heat pipelines and draining of manholes Korea National Housing Coporation

2011

Construction work for the machine equipment under the construction of repairing the dormitory in Osan Military Air Base, South Korea. FED

2011

Construction work for the heat pipelines under the construction of the integrated energy plant in Kim-Cheon Kimcheon Energy

2011

Civil-engineering work and other work for buring steam supplying pipelines under the construction on zone C at the Hyo-Sung factory in Yong-In. Hyosung

2011

Pipeline materials and others for buring steam supplying pipelines under the construction of the Hyo-Sung factory in Yong-In. Hyosung

2011

Construction for improving the condensate water recovery pipelins at Han-Kook Paper Co.Ltd. LS Nikko

2011

Construction work for buring the pipelines of rebuilding steam supply system at Han-Ju Co.,Ltd. Samsung Precision Chemistry

2011

Construction work for installing a fluid coupling system. Moo Lim Power

2012

Construction for improving the steam supplying pipeline at Han-Kook Paper Co.,Ltd. LS Nikko

2012

Construction work for TVR repairment of a steam supplying facility in Yeo-Su and By-Pass emergency work SPT

2012

Construction work for chemical product supplying underground pipelines at Samsung precision chemical Co.,Ltd. Samsung Precision Chemistry

2012

Construction work for buring U/G pipelines for SPC extra steam sales. Samsung Petrochemistry

2012

Ol-san steam high way energy saving project (ESCO fund). Korea Industry Complex Coporation

2012

Work for installing a heat pump system using waste water heat (heat storaging tank etc.). Samsung Everland Coporation

2012

Work for installing machine equipment related to the vehicle maintenance at Pyeong-Teak brigade. FED

2012

Work for installing machine equipment under the construction of replacing an old steam pipeline system of Gu-mi power plant. STX Energy

2012

Pipeline materials for the construction replacing an old steam pipeline system of Gu-mi power plant. STX Energy

2012

Construction work for additional U/G pipelines under the construction of Kim-cheon integrated energy supplying system. Kimcheon Energy

2013

Work for installing the remaining heat pipeline of a waste food resource plant. GyeongJu City Government

2013

Construction work for replacing an old steam pipeline network of Gu-mi power plant. STX Energy

2013

Construction work for installing the auto pneumatic trash collection system in Naepo new town of Chungcheong province. Public Procurement Service

2013

Construction work for the underground electricity cable between Sinseo cogeneration power plant and Ansim district 3.  KEPCO

2013

Work for installing the pipeline related to steam sale of Songwon/Petroleum1. Taekwang

2013

Work for [SC2428]PR-PIP Pipes(HA23A) under SC2428/SMP W-1 project. SMP

2013

Construction work for zone 1&3 pipelines under the Hanam&Misa integrated energy supplying project. Hanam Energy Service

2013

Construciton work for the heat pipelines related to the construction of Pyeongtaek Sosabeol integrated energy plant. Pyeongtaek Energy Service

2013

Work for installing the pipelines of Gimcheon garbage incineration plant. Gimcheon Energy

2013

Erection for Dongnam solar power plant. Serveone

2013

Work for installing machine equipment under K-Meg Sihwa&Banwol substantiation project. Easyecotech

2013

Construction work for the heat pipelines between Wirye zone1 and 2, and between Wirye and Yeongyege. Wirye Energy Service

2014

Dredging work for Muhan stream Cheongyang-Gun

2014

Construction for replacing sidewalk blocks in Jeongsan agricultural industrial complex. Cheongyang-Gun

2014

Construction for the pipelines between  Kukin and Samsung Corning Advanced Glass. Yonganm Energy

2014

Construction for machine, fire fighting and geothermal facilities under Gunsan military police facility project. Defense Installation Agency

2014

Construction for the heat pipelines on zone 1-2BL in Asan Tangjung. LH Asan Energy Project Group

2014

Construction for replacing pipelines from  private land, Kangil-dong 498-11. Ko-One Energy Service

2014

Construction for the heat pipelines on zone 2 of Wirye new town integrated energy supplying project. Wirye Energy Service

2014

Construction for fabricating and installing stairs for snow removing work at Ochang Solar Power Plant. Serve-One

2014

Construction for steam supplying pipelines at W-Scope Korea Co. Chungcheong Energy Service

2014

Construction for heat pipelines of integrated energy project on Myongii district. Busan City Gas

2015

Construction for inserting underground pipelines under S-Oil low pressure steam turbine power plant project. KD Power Tech

2015

Construction for machine equipment of Total-DaeSan pipelines supplying petroleum.  Samsung Total

 

 

 

Head Office : Unit 1104, 234, Beotkkot-ro, Geumcheon-gu, Seoul, 153-798, Republic of Korea

Factory : Banghan-ri, Bibong-myeon, Cheongyang-gun, Chungcheongnam-do, 345-881, Republic of Korea

CEO : Kwan Soo, Bang  I TEL. +82-2-6719-8400  FAX. +82-2-523-5664

 

Copyright 2013@DAEKYUNG ENERTECH Co., Ltd. All rights reserved. For more information, Contact dke@dke.co.kr